The scope of work includes for the installation only of new plate girders to replace the entire existing bridge in phases over the period of 5 years (multiple phases per year). This is required to keep the bridge open during construction. The majority of the erection work will utilize cranes placed on multiple barges for hoisting purposes. In addition the scope includes structural steel repair work to the existing bridge to prevent further stress cracking at the web/stiffener interface.
Bay of Quinte Bridge
Client: Aecon Construction
Location: Kingston, Ontario
Trades: Ironworkers
Engineer: McIntosh Perr
Location: Kingston, Ontario