Details

  • Client Dufferin Construction
  • Engineer Pedelta Structural Engineering
  • Location Toronto, Ontario
  • Trades Ironworkers

Summary

This project includes the pre-assembly on temporary shoring supports and erection of two separate stainless steel cable stay supported bridges complete with precast panels. Each 150 ton bridge is supported by one outward leaning arch.