Details

  • Engineer Mainline Engineering

Summary

The project encompassed the supply of materials, fabrication and delivery of a cryogenic cold box to the Airgas facility in Calvert City KY. Scope of work included supply and assembly of the Cold Box frames and spooling of piping for units 3&4. The overall dimensions of the Cold Box are 14 ft. (H) x 16 ft. (W) x 160 ft. (L). Transport and delivery included loading the units onto a “Laker” barges at our roll-on / roll off dock located at our Port Robinson fabrication facility. Due to their size, the units required transfer onto a “hopper” barge in Chicago IL to enable further transport down the Mississippi River to Calvert City, KY.